
BAHARESTAN INTERCHANGE
Client
MUNICIPALITY OF KHORRAMABAD
Location
KHORRAMABAD, IRAN
Technical Information
Design and supervision of the urban underpass with two overpass bridges includes:
- Length of the underpass with six traffic lanes: 1.1 km
- Main and U-turn bridges with reinforced concrete voided slab deck
- Total length of the main overpass bridge: 41 m
- Number of spans in the main bridge: 2
- Total length of the U-turn overpass bridge: 31 m
- Number of spans in the U-turn bridge: 2
- 1.5 m diameter soldier pile walls for retaining structures