Satropot

HASHTGERD CLOVERLEAF INTERCHANGE

Client
MINISTRY OF ROADS AND URBAN DEVELOPMENT

Location
KARAJ - QAZVIN FREEWAY, IRAN

Technical Information

Design and supervision the cloverleaf interchange with full movements over Karaj-Qazvin freeway includes:

  • Total length of main road and eigth ramps: 10 km
  • Total length of bridge: 76 m
  • Three spans (16.5 m+43 m+16.5 m) and two seperate through lanes with 11.8 m width for each one
  • Deck with composite box girders consist of steel twin trapezoidal box girders and concrete slab
  • Depth of box girders: ~1.5 m

Duration
2003 - 2011