Satropot

BUS RAPID TRANSIT IN I.A. HIGHWAY

Client
MUNICIPALITY OF TEHRAN

Location
TEHRAN, IRAN

Technical Information

Bus rapid transit (BRT) and its stations for the use of 16-meter buses with left door in I.A. highway includes:

  • Length of BRT line: 25 km
  • Width of BRT line: 12.5 m (2 lanes)
  • The shelter structure of stations and access stairs: metal
  • Number of one-way stations: 15
  • Number of two-way stations: 14
  • Length of stations: 90 km
  • Width of stations: 3 m
  • The pavement of the BRT line: RCC cocrete with coloured asphalt

Duration
2009 - 2014